Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Check Dam/Stop Dam
4.3%
OF COST SPENT
₹19.72 L spent
of ₹4.54 Cr sanctioned
₹4.34 Cr still to spend
on 49 ongoing works
Works ongoing
49
Open the list of these works →
Sanctioned
₹4.54 Cr
Pure scheme (wage + material)
Expenditure since inception
₹19.72 L
4.3% of sanction
Balance cost (unspent)
₹4.34 Cr
Wage₹1.64 Cr
Material₹2.70 Cr
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore