Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Water Drain/Diversion Channel/Drainage/Field Channel
72.4%
OF COST SPENT
₹2.63 Cr spent
of ₹3.62 Cr sanctioned
₹99.86 L still to spend
on 32 ongoing works
Works ongoing
32
Open the list of these works →
Sanctioned
₹3.62 Cr
Pure scheme (wage + material)
Expenditure since inception
₹2.63 Cr
72.4% of sanction
Balance cost (unspent)
₹99.86 L
Wage₹66.50 L
Material₹33.37 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr