Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGWorks for Flood Control and Protection
0.1%
OF COST SPENT
₹8.93 L spent
of ₹108.16 Cr sanctioned
₹108.07 Cr still to spend
on 1,690 ongoing works
Works ongoing
1,690
Open the list of these works →
Sanctioned
₹108.16 Cr
Pure scheme (wage + material)
Expenditure since inception
₹8.93 L
0.1% of sanction
Balance cost (unspent)
₹108.07 Cr
Wage₹65.00 Cr
Material₹43.07 Cr
Trend · statewide

—
—
Slowest spending this FY · worth a look
Bhind — Bhind ₹39,528
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By district

Amounts in ₹ Crore