Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Road and Culvert
84.1%
OF COST SPENT
₹1.11 Cr spent
of ₹1.32 Cr sanctioned
₹21.04 L still to spend
on 4 ongoing works
Works ongoing
4
Open the list of these works →
Sanctioned
₹1.32 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.11 Cr
84.1% of sanction
Balance cost (unspent)
₹21.04 L
Wage₹4.61 L
Material₹16.43 L
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh