Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Check Dam/Stop Dam
46.2%
OF COST SPENT
₹5.11 Cr spent
of ₹11.04 Cr sanctioned
₹5.94 Cr still to spend
on 167 ongoing works
Works ongoing
167
Open the list of these works →
Sanctioned
₹11.04 Cr
Pure scheme (wage + material)
Expenditure since inception
₹5.11 Cr
46.2% of sanction
Balance cost (unspent)
₹5.94 Cr
Wage₹2.29 Cr
Material₹3.65 Cr
Trend · statewide

—
—
Slowest spending this month · worth a look
Rewa — Gangev −₹69.63 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore