Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Road and Culvert
1.7%
OF COST SPENT
₹21.29 L spent
of ₹12.79 Cr sanctioned
₹12.58 Cr still to spend
on 103 ongoing works
Works ongoing
103
Open the list of these works →
Sanctioned
₹12.79 Cr
Pure scheme (wage + material)
Expenditure since inception
₹21.29 L
1.7% of sanction
Balance cost (unspent)
₹12.58 Cr
Wage₹6.66 Cr
Material₹5.91 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Narmadapuram — Hoshangabad ₹0
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore