Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Trench
13.2%
OF COST SPENT
₹26.97 L spent
of ₹2.04 Cr sanctioned
₹1.77 Cr still to spend
on 34 ongoing works
Works ongoing
34
Open the list of these works →
Sanctioned
₹2.04 Cr
Pure scheme (wage + material)
Expenditure since inception
₹26.97 L
13.2% of sanction
Balance cost (unspent)
₹1.77 Cr
Wage₹1.44 Cr
Material₹32.94 L
Trend · statewide

—
—
Slowest spending this fortnight · worth a look
Sidhi — Sihawal −₹1.36 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore