Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Percolation Tank
34.3%
OF COST SPENT
₹5.00 Cr spent
of ₹14.60 Cr sanctioned
₹9.59 Cr still to spend
on 148 ongoing works
Works ongoing
148
Open the list of these works →
Sanctioned
₹14.60 Cr
Pure scheme (wage + material)
Expenditure since inception
₹5.00 Cr
34.3% of sanction
Balance cost (unspent)
₹9.59 Cr
Wage₹7.07 Cr
Material₹2.53 Cr
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore