Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Road and Culvert
66.3%
OF COST SPENT
₹15.70 Cr spent
of ₹23.67 Cr sanctioned
₹7.97 Cr still to spend
on 94 ongoing works
Works ongoing
94
Open the list of these works →
Sanctioned
₹23.67 Cr
Pure scheme (wage + material)
Expenditure since inception
₹15.70 Cr
66.3% of sanction
Balance cost (unspent)
₹7.97 Cr
Wage₹4.16 Cr
Material₹3.80 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore