Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Road and Culvert
73%
OF COST SPENT
₹88.38 L spent
of ₹1.21 Cr sanctioned
₹32.75 L still to spend
on 7 ongoing works
Works ongoing
7
Open the list of these works →
Sanctioned
₹1.21 Cr
Pure scheme (wage + material)
Expenditure since inception
₹88.38 L
73% of sanction
Balance cost (unspent)
₹32.75 L
Wage₹7.59 L
Material₹25.15 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore