Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Trench
26.9%
OF COST SPENT
₹7.51 Cr spent
of ₹27.90 Cr sanctioned
₹20.39 Cr still to spend
on 501 ongoing works
Works ongoing
501
Open the list of these works →
Sanctioned
₹27.90 Cr
Pure scheme (wage + material)
Expenditure since inception
₹7.51 Cr
26.9% of sanction
Balance cost (unspent)
₹20.39 Cr
Wage₹16.01 Cr
Material₹4.37 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore