Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Water Drain/Diversion Channel/Drainage/Field Channel
0.1%
OF COST SPENT
₹1,807 spent
of ₹15.11 L sanctioned
₹15.09 L still to spend
on 2 ongoing works
Works ongoing
2
Open the list of these works →
Sanctioned
₹15.11 L
Pure scheme (wage + material)
Expenditure since inception
₹1,807
0.1% of sanction
Balance cost (unspent)
₹15.09 L
Wage₹13.17 L
Material₹1.93 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Lakh