Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Check Dam/Stop Dam
25.1%
OF COST SPENT
₹28.21 L spent
of ₹1.12 Cr sanctioned
₹84.03 L still to spend
on 25 ongoing works
Works ongoing
25
Open the list of these works →
Sanctioned
₹1.12 Cr
Pure scheme (wage + material)
Expenditure since inception
₹28.21 L
25.1% of sanction
Balance cost (unspent)
₹84.03 L
Wage₹64.14 L
Material₹19.89 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost