Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Road and Culvert
29.4%
OF COST SPENT
₹34.14 L spent
of ₹1.16 Cr sanctioned
₹82.17 L still to spend
on 44 ongoing works
Works ongoing
44
Open the list of these works →
Sanctioned
₹1.16 Cr
Pure scheme (wage + material)
Expenditure since inception
₹34.14 L
29.4% of sanction
Balance cost (unspent)
₹82.17 L
Wage₹28.49 L
Material₹53.68 L
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh