Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Road and Culvert
21.9%
OF COST SPENT
₹8.66 L spent
of ₹39.57 L sanctioned
₹30.91 L still to spend
on 1 ongoing works
Works ongoing
1
Open the list of these works →
Sanctioned
₹39.57 L
Pure scheme (wage + material)
Expenditure since inception
₹8.66 L
21.9% of sanction
Balance cost (unspent)
₹30.91 L
Wage₹4.28 L
Material₹26.63 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Lakh