Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Percolation Tank
27.8%
OF COST SPENT
₹15.72 L spent
of ₹56.58 L sanctioned
₹40.86 L still to spend
on 13 ongoing works
Works ongoing
13
Open the list of these works →
Sanctioned
₹56.58 L
Pure scheme (wage + material)
Expenditure since inception
₹15.72 L
27.8% of sanction
Balance cost (unspent)
₹40.86 L
Wage₹30.64 L
Material₹10.22 L
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh