Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Check Dam/Stop Dam
1.8%
OF COST SPENT
₹27,150 spent
of ₹14.97 L sanctioned
₹14.70 L still to spend
on 1 ongoing works
Works ongoing
1
Open the list of these works →
Sanctioned
₹14.97 L
Pure scheme (wage + material)
Expenditure since inception
₹27,150
1.8% of sanction
Balance cost (unspent)
₹14.70 L
Wage₹2.33 L
Material₹12.37 L