Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstr of Cement Concrete Roads
3.7%
OF COST SPENT
₹2.92 L spent
of ₹79.72 L sanctioned
₹76.80 L still to spend
on 108 ongoing works
Works ongoing
108
Open the list of these works →
Sanctioned
₹79.72 L
Pure scheme (wage + material)
Expenditure since inception
₹2.92 L
3.7% of sanction
Balance cost (unspent)
₹76.80 L
Wage₹71.74 L
Material₹5.06 L
Trend · statewide

—
—
Slowest spending this week · worth a look
NARMADAPURAM — HOSHANGABAD ₹0
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh