Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Check Dam/Stop Dam
67.9%
OF COST SPENT
₹6.30 Cr spent
of ₹9.28 Cr sanctioned
₹2.98 Cr still to spend
on 69 ongoing works
Works ongoing
69
Open the list of these works →
Sanctioned
₹9.28 Cr
Pure scheme (wage + material)
Expenditure since inception
₹6.30 Cr
67.9% of sanction
Balance cost (unspent)
₹2.98 Cr
Wage₹1.36 Cr
Material₹1.63 Cr