Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Toilets
31.5%
OF COST SPENT
₹1.83 Cr spent
of ₹5.82 Cr sanctioned
₹3.99 Cr still to spend
on 458 ongoing works
Works ongoing
458
Open the list of these works →
Sanctioned
₹5.82 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.83 Cr
31.5% of sanction
Balance cost (unspent)
₹3.99 Cr
Wage₹3.03 Cr
Material₹95.97 L
Trend · statewide

—
—
Slowest spending this month · worth a look
Rewa — Gangev −₹42.23 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By district

Amounts in ₹ Crore