Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Well
64.8%
OF COST SPENT
₹12.11 L spent
of ₹18.70 L sanctioned
₹6.59 L still to spend
on 4 ongoing works
Works ongoing
4
Open the list of these works →
Sanctioned
₹18.70 L
Pure scheme (wage + material)
Expenditure since inception
₹12.11 L
64.8% of sanction
Balance cost (unspent)
₹6.59 L
Wage₹1.27 L
Material₹5.32 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Lakh