Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAFarm Pond
39.7%
OF COST SPENT
₹5.57 Cr spent
of ₹14.02 Cr sanctioned
₹8.45 Cr still to spend
on 679 ongoing works
Works ongoing
679
Open the list of these works →
Sanctioned
₹14.02 Cr
Pure scheme (wage + material)
Expenditure since inception
₹5.57 Cr
39.7% of sanction
Balance cost (unspent)
₹8.45 Cr
Wage₹6.07 Cr
Material₹2.38 Cr
Trend · statewide

—
—
Slowest spending this month · worth a look
Rewa — Gangev −₹69.63 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore