Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA
43.6%
OF COST SPENT
₹44.71 Cr spent
of ₹102.61 Cr sanctioned
₹57.90 Cr still to spend
on 8,855 ongoing works
Works ongoing
8,855
Open the list of these works →
Sanctioned
₹102.61 Cr
Pure scheme (wage + material)
Expenditure since inception
₹44.71 Cr
43.6% of sanction
Balance cost (unspent)
₹57.90 Cr
Wage₹30.31 Cr
Material₹27.59 Cr
Trend · statewide

—
—
Slowest spending this month · worth a look
Rewa — Gangev −₹69.63 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore