Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Check Dam/Stop Dam
60.6%
OF COST SPENT
₹4.54 Cr spent
of ₹7.49 Cr sanctioned
₹2.96 Cr still to spend
on 57 ongoing works
Works ongoing
57
Open the list of these works →
Sanctioned
₹7.49 Cr
Pure scheme (wage + material)
Expenditure since inception
₹4.54 Cr
60.6% of sanction
Balance cost (unspent)
₹2.96 Cr
Wage₹1.81 Cr
Material₹1.15 Cr
Trend · statewide

—
—
Slowest spending this FY · worth a look
Dhar — Tirla −₹10.48 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore