Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Road and Culvert
0.1%
OF COST SPENT
₹20,400 spent
of ₹3.03 Cr sanctioned
₹3.03 Cr still to spend
on 20 ongoing works
Works ongoing
20
Open the list of these works →
Sanctioned
₹3.03 Cr
Pure scheme (wage + material)
Expenditure since inception
₹20,400
0.1% of sanction
Balance cost (unspent)
₹3.03 Cr
Wage₹1.09 Cr
Material₹1.93 Cr
Trend · statewide

—
—
Slowest spending this fortnight · worth a look
Sidhi — Sihawal −₹1.36 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore