Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Canal
5.9%
OF COST SPENT
₹26,730 spent
of ₹4.54 L sanctioned
₹4.27 L still to spend
on 1 ongoing works
Works ongoing
1
Open the list of these works →
Sanctioned
₹4.54 L
Pure scheme (wage + material)
Expenditure since inception
₹26,730
5.9% of sanction
Balance cost (unspent)
₹4.27 L
Wage₹2.32 L
Material₹1.95 L