Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Trench
3.6%
OF COST SPENT
₹24,707 spent
of ₹6.91 L sanctioned
₹6.66 L still to spend
on 2 ongoing works
Works ongoing
2
Open the list of these works →
Sanctioned
₹6.91 L
Pure scheme (wage + material)
Expenditure since inception
₹24,707
3.6% of sanction
Balance cost (unspent)
₹6.66 L
Wage₹5.68 L
Material₹98,534
Trend · statewide

—
—
Slowest spending this quarter · worth a look
Rewa — Gangev −₹42.23 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh