Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Road and Culvert
47.1%
OF COST SPENT
₹1.99 Cr spent
of ₹4.21 Cr sanctioned
₹2.23 Cr still to spend
on 35 ongoing works
Works ongoing
35
Open the list of these works →
Sanctioned
₹4.21 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.99 Cr
47.1% of sanction
Balance cost (unspent)
₹2.23 Cr
Wage₹69.66 L
Material₹1.53 Cr
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore