Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Recharge Pits
4.1%
OF COST SPENT
₹6,375 spent
of ₹1.55 L sanctioned
₹1.48 L still to spend
on 3 ongoing works
Works ongoing
3
Open the list of these works →
Sanctioned
₹1.55 L
Pure scheme (wage + material)
Expenditure since inception
₹6,375
4.1% of sanction
Balance cost (unspent)
₹1.48 L
Wage₹1.05 L
Material₹43,119
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh