Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Check Dam/Stop Dam
48.1%
OF COST SPENT
₹10.50 Cr spent
of ₹21.81 Cr sanctioned
₹11.31 Cr still to spend
on 531 ongoing works
Works ongoing
531
Open the list of these works →
Sanctioned
₹21.81 Cr
Pure scheme (wage + material)
Expenditure since inception
₹10.50 Cr
48.1% of sanction
Balance cost (unspent)
₹11.31 Cr
Wage₹4.56 Cr
Material₹6.74 Cr
Trend · statewide

—
—
Slowest spending this FY · worth a look
Bhind — Ater ₹15.77 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore