Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Check Dam/Stop Dam
13.9%
OF COST SPENT
₹59.60 L spent
of ₹4.28 Cr sanctioned
₹3.69 Cr still to spend
on 54 ongoing works
Works ongoing
54
Open the list of these works →
Sanctioned
₹4.28 Cr
Pure scheme (wage + material)
Expenditure since inception
₹59.60 L
13.9% of sanction
Balance cost (unspent)
₹3.69 Cr
Wage₹1.23 Cr
Material₹2.46 Cr
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore