Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGWorks for Flood Control and Protection
51.6%
OF COST SPENT
₹1.83 Cr spent
of ₹3.55 Cr sanctioned
₹1.72 Cr still to spend
on 31 ongoing works
Works ongoing
31
Open the list of these works →
Sanctioned
₹3.55 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.83 Cr
51.6% of sanction
Balance cost (unspent)
₹1.72 Cr
Wage₹78.24 L
Material₹93.45 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost