Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Trench
41.3%
OF COST SPENT
₹51.63 L spent
of ₹1.25 Cr sanctioned
₹73.40 L still to spend
on 13 ongoing works
Works ongoing
13
Open the list of these works →
Sanctioned
₹1.25 Cr
Pure scheme (wage + material)
Expenditure since inception
₹51.63 L
41.3% of sanction
Balance cost (unspent)
₹73.40 L
Wage₹51.51 L
Material₹21.89 L
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh