Ongoing works in MGNREGA + VB-G RAM G

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Road and Culvert
51.2%
OF COST SPENT
₹2.82 L spent
of ₹5.51 L sanctioned
₹2.69 L still to spend
on 1 ongoing works
Works ongoing
1
Open the list of these works →
Sanctioned
₹5.51 L
Pure scheme (wage + material)
Expenditure since inception
₹2.82 L
51.2% of sanction
Balance cost (unspent)
₹2.69 L
Wage₹40,559
Material₹2.28 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh