Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Trench
6.7%
OF COST SPENT
₹6.05 L spent
of ₹90.71 L sanctioned
₹84.66 L still to spend
on 26 ongoing works
Works ongoing
26
Open the list of these works →
Sanctioned
₹90.71 L
Pure scheme (wage + material)
Expenditure since inception
₹6.05 L
6.7% of sanction
Balance cost (unspent)
₹84.66 L
Wage₹69.83 L
Material₹14.83 L