Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Tank
0.7%
OF COST SPENT
₹4,053 spent
of ₹5.63 L sanctioned
₹5.59 L still to spend
on 4 ongoing works
Works ongoing
4
Open the list of these works →
Sanctioned
₹5.63 L
Pure scheme (wage + material)
Expenditure since inception
₹4,053
0.7% of sanction
Balance cost (unspent)
₹5.59 L
Wage₹4.12 L
Material₹1.47 L
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By district

Amounts in ₹ Lakh