Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of building/workshed for SHG
58.5%
OF COST SPENT
₹42.82 L spent
of ₹73.16 L sanctioned
₹30.34 L still to spend
on 11 ongoing works
Works ongoing
11
Open the list of these works →
Sanctioned
₹73.16 L
Pure scheme (wage + material)
Expenditure since inception
₹42.82 L
58.5% of sanction
Balance cost (unspent)
₹30.34 L
Wage₹88,566
Material₹29.45 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh