Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstr of Cement Concrete Roads
2.2%
OF COST SPENT
₹3.92 L spent
of ₹1.77 Cr sanctioned
₹1.73 Cr still to spend
on 142 ongoing works
Works ongoing
142
Open the list of these works →
Sanctioned
₹1.77 Cr
Pure scheme (wage + material)
Expenditure since inception
₹3.92 L
2.2% of sanction
Balance cost (unspent)
₹1.73 Cr
Wage₹1.21 Cr
Material₹52.59 L
Trend · statewide

—
—
Slowest spending this week · worth a look
NARMADAPURAM — HOSHANGABAD ₹0
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh