Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstr of Cement Concrete Roads
54.8%
OF COST SPENT
₹1.26 Cr spent
of ₹2.29 Cr sanctioned
₹1.04 Cr still to spend
on 367 ongoing works
Works ongoing
367
Open the list of these works →
Sanctioned
₹2.29 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.26 Cr
54.8% of sanction
Balance cost (unspent)
₹1.04 Cr
Wage₹82.12 L
Material₹21.51 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore