Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Well
49.9%
OF COST SPENT
₹64.24 L spent
of ₹1.29 Cr sanctioned
₹64.61 L still to spend
on 45 ongoing works
Works ongoing
45
Open the list of these works →
Sanctioned
₹1.29 Cr
Pure scheme (wage + material)
Expenditure since inception
₹64.24 L
49.9% of sanction
Balance cost (unspent)
₹64.61 L
Wage₹19.04 L
Material₹45.57 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr