Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMG
5.5%
OF COST SPENT
₹54,129 spent
of ₹9.78 L sanctioned
₹9.24 L still to spend
on 9 ongoing works
Works ongoing
9
Open the list of these works →
Sanctioned
₹9.78 L
Pure scheme (wage + material)
Expenditure since inception
₹54,129
5.5% of sanction
Balance cost (unspent)
₹9.24 L
Wage₹5.71 L
Material₹3.53 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh