Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA
39.6%
OF COST SPENT
₹11.61 L spent
of ₹29.35 L sanctioned
₹17.74 L still to spend
on 93 ongoing works
Works ongoing
93
Open the list of these works →
Sanctioned
₹29.35 L
Pure scheme (wage + material)
Expenditure since inception
₹11.61 L
39.6% of sanction
Balance cost (unspent)
₹17.74 L
Wage₹13.53 L
Material₹4.20 L
Trend · statewide

—
—
Slowest spending this month · worth a look
Rewa — Gangev −₹69.63 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh