Reset

Ongoing works in MGNREGA + VB-G RAM G

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMG
43.6%
OF COST SPENT
₹64.33 Cr spent
of ₹147.44 Cr sanctioned
₹83.11 Cr still to spend
on 13,000 ongoing works
Works ongoing
13,000
Open the list of these works →
Sanctioned
₹147.44 Cr
Pure scheme (wage + material)
Expenditure since inception
₹64.33 Cr
43.6% of sanction
Balance cost (unspent)
₹83.11 Cr
Wage₹46.49 Cr
Material₹36.62 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

No works match these filters.