Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Road and Culvert
43.8%
OF COST SPENT
₹3.33 Cr spent
of ₹7.60 Cr sanctioned
₹4.27 Cr still to spend
on 37 ongoing works
Works ongoing
37
Open the list of these works →
Sanctioned
₹7.60 Cr
Pure scheme (wage + material)
Expenditure since inception
₹3.33 Cr
43.8% of sanction
Balance cost (unspent)
₹4.27 Cr
Wage₹71.05 L
Material₹3.56 Cr
Trend · statewide

—
—
Slowest spending this month · worth a look
Rewa — Gangev −₹69.63 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore