Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstr of Cement Concrete Roads
2.9%
OF COST SPENT
₹6.98 L spent
of ₹2.37 Cr sanctioned
₹2.30 Cr still to spend
on 135 ongoing works
Works ongoing
135
Open the list of these works →
Sanctioned
₹2.37 Cr
Pure scheme (wage + material)
Expenditure since inception
₹6.98 L
2.9% of sanction
Balance cost (unspent)
₹2.30 Cr
Wage₹1.32 Cr
Material₹97.94 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Narmadapuram — Hoshangabad ₹0
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh