Ongoing works in MGNREGA + VB-G RAM G

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Check Dam/Stop Dam
22.4%
OF COST SPENT
₹25.40 L spent
of ₹1.13 Cr sanctioned
₹87.99 L still to spend
on 14 ongoing works
Works ongoing
14
Open the list of these works →
Sanctioned
₹1.13 Cr
Pure scheme (wage + material)
Expenditure since inception
₹25.40 L
22.4% of sanction
Balance cost (unspent)
₹87.99 L
Wage₹50.77 L
Material₹37.21 L
Trend · statewide

—
—
Slowest spending this quarter · worth a look
Rewa — Gangev −₹42.23 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh