Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Tank
1.8%
OF COST SPENT
₹71.57 L spent
of ₹39.60 Cr sanctioned
₹38.89 Cr still to spend
on 220 ongoing works
Works ongoing
220
Open the list of these works →
Sanctioned
₹39.60 Cr
Pure scheme (wage + material)
Expenditure since inception
₹71.57 L
1.8% of sanction
Balance cost (unspent)
₹38.89 Cr
Wage₹20.35 Cr
Material₹18.53 Cr
Trend · statewide

—
—
Slowest spending this FY · worth a look
Bhind — Bhind ₹39,528
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore