Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Check Dam/Stop Dam
1.5%
OF COST SPENT
₹13,000 spent
of ₹8.95 L sanctioned
₹8.82 L still to spend
on 2 ongoing works
Works ongoing
2
Open the list of these works →
Sanctioned
₹8.95 L
Pure scheme (wage + material)
Expenditure since inception
₹13,000
1.5% of sanction
Balance cost (unspent)
₹8.82 L
Wage₹1.49 L
Material₹7.32 L
Trend · statewide

—
—
Slowest spending this quarter · worth a look
Indore — Mhow −₹30.65 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh