Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstr of Compound wall
53.5%
OF COST SPENT
₹78.77 L spent
of ₹1.47 Cr sanctioned
₹68.49 L still to spend
on 24 ongoing works
Works ongoing
24
Open the list of these works →
Sanctioned
₹1.47 Cr
Pure scheme (wage + material)
Expenditure since inception
₹78.77 L
53.5% of sanction
Balance cost (unspent)
₹68.49 L
Wage₹36.40 L
Material₹32.09 L
Trend · statewide

—
—
Slowest spending this FY · worth a look
Dhar — Tirla −₹8.26 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh