Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Check Dam/Stop Dam
27.2%
OF COST SPENT
₹3.90 Cr spent
of ₹14.33 Cr sanctioned
₹10.44 Cr still to spend
on 174 ongoing works
Works ongoing
174
Open the list of these works →
Sanctioned
₹14.33 Cr
Pure scheme (wage + material)
Expenditure since inception
₹3.90 Cr
27.2% of sanction
Balance cost (unspent)
₹10.44 Cr
Wage₹3.31 Cr
Material₹7.12 Cr
Trend · statewide

—
—
Slowest spending this quarter · worth a look
Rewa — Gangev −₹69.63 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore